Skip to content
Safegen
Pipework inside an industrial plant

COSHH

COSHH done in one sitting, not one project.

Each hazardous substance is one record: what it is, where it is stored, its hazard pictograms and signal word, the safety data sheet, who is exposed and how, the controls, PPE, monitoring and health surveillance decisions, and the sign-off.

The COSHH register showing substances, pictograms and assessment status

What it does

Register and assessment together

HSE describes four steps and a small business does them in one go. So does Safegen: two verbs, save and sign off.

Sign-off with standards

You cannot sign off a substance whose residual risk is still high, or without a safety data sheet on file. The record tells you what is missing.

Exposure limits and routes

EH40 workplace exposure limits, exposure routes, frequency and duration are captured so the controls are justified, not guessed.

Review cycle

Set the review frequency and the calendar keeps it. Reviews re-stamp the assessment rather than creating paperwork.

See coshh on your own sites.

Thirty minutes. We walk through your assets, your people and your paperwork, and show you what the watch would raise on day one.

Book a demoOr start a free trial

No card · UK hosted · Live in a week