Skip to content
Safegen
Tall warehouse racking in low light

Equipment inspections

Thorough examinations, recorded the way an inspector expects.

Each statutory examination is a record: who inspected, for which firm, the certificate reference, the outcome, the defects, and the report itself. The next due date rolls forward automatically on the right interval, and a failed exam can take the equipment out of service on the spot.

The inspection register with statutory dates ranked by urgency

What it does

One record per examination

LOLER thorough examination, PUWER inspection, PSSR written scheme, EICR, extinguisher service. Kept until the next report is made, as LOLER requires.

Defects become jobs

Passed with defects or failed raises a corrective action with an owner and a fix-by date. It appears in the action inbox and the calendar until resolved.

Legal flag and interval

Statutory dates carry a legal badge and sort above internal ones. Intervals are months, not day counts, so anniversaries never drift.

Inspection register export

The register an auditor sees is the spreadsheet they take away: one row per tracked date on every active asset, with the last examination beside it.

See equipment inspections on your own sites.

Thirty minutes. We walk through your assets, your people and your paperwork, and show you what the watch would raise on day one.

Book a demoOr start a free trial

No card · UK hosted · Live in a week